Stands Save on your Stand
Menu

CPI InnoTrans 2016

Published by at Berlin (Germany)

The stand was spray painted, assembled in 3 day period. 42 square meters.

More news from Condix Messe Sp. z o.o. Sp. k.

Eutelsat

Located in the lobby of the main entrance, complicated steel construction, LED laser cut lettering and LED lit glass...

Quickplay

Laminated exhibitors with TV, meeting room with graphics. Assembly: 2 days.

Peerless

Stand designed by FORMATIONLIVE. Size: 122sqm with 44sqm double deck. CNC cut mosaic, lit graphics. Assembled in 5 days.

POL-MAK

Size: 84sqm, assembly: 4 days, prefabrication: 8 days. Laminate module shelving, designed and prepared by Condix....

North Telecom

42 sqm stand. Assembled in 3 day period. Design made by Formation LIVE.

Smartlabs IBC 2016

The stand was assembled and finished in 2 day period.
Request estimate